Electrical
Mih*** ***** (XX anos)
QA/QC Electrical, Instrumentation and Control Engineer em Bureau Veritas Exploitation/France
High School-Petru Poni, Onesti (Romania)
Residente fora de Portugal
Este candidato está disposto a se mudar
|
Experiência
QA/QC Electrical, Instrumentation and Control Engineer
Bureau Veritas Exploitation/France
abr 2019
-
Atualmente
Project, Type & Design: ITER- (International Thermonuclear Experimental Reactor). Details of Experience: • QA/QC-supervision & Quality control during construction&Installation, review and modifications for all documentation associated with Electrical and Instrumentation Installation; Inspection&Test Plan (ITP); ITR’s (Inspection Test Record) and Quality Test Plan (QTP) for ITER project; Method Statements, Vendor Documentation and Maintenance & Operations Manuals • Ensure all QC procedures and process controls are being implemented within all areas relating to instrumentation items. • I reviewed all contractors QC Instrumentation installation ITP's and method statements and verify contractor is following method statements. • I followed and inspected the reception of electrical and instrumentation materials. • I reviewed SAT (Site Acceptance test) Procedure modification and harmonization of existing ITR's (Inspection and Test Record), development of new ITR's to be in according with Construction and Testing requirements • I checked installation and witness for Insulation Resistance Test for DC HV Bus bars 13.7 KV/55 KAmps: TF (Toroidal Field); PF (Poloidal Field); CS (Compensation Solenoid) and CC (Compensation Circuit). • I checked and I approved, documentation downloaded in SPO (Smart Plant Owner) by Contractors and Suppliers before installation and after testing. • Inspection for: instrument installation including pre-installation visual checks, tubing installation, leak test for tubing, LV motors: Windings insulation resistance test, PI Test (Polarization Index) and Vibration measuring test. • Inspection for installation and for Partial Discharge Test of HV cables 66 KV and 22 KV: between Harmonic Filters and high voltage switches, after that between high voltage switches and power transformers 66 KV/13.7 KV or 22 KV/13.7 KV. • Reviewing the correctness of the content of MCD (Mechanical Completion Dossier) uploaded by contractors for electrical works in SPO (Smart Plant Owner), its approval or rejection.
QA/QC E&I Engineer
Ansaldo Boilers/Italy
fev 2017
-
mar 2018
Project, Type & Design: Expansion Simple Cycle to C.C.P.P (Combined Cycle Power Plant) in Egypt/Al-Shabaab/HRSG (Heat Recovery Steam Generator). Details of Experience: • Preparation of Red Mark and As Built for drawings (electrical and instrumentation) to achieve the final drawings by engineering department Sofinter/ACBoilers-Milano/Italy. • Recording, monitoring and control Non-conformance (NCR), investigations and monitoring of the implementation of corrective action • Coordinate with the client for punch list closure and final acceptance. • QA/QC-supervision& Quality control during construction& Installation, review all documentation associated with Electrical Installation: RFI (Request for Inspection); Inspection & Test Plan (ITP) and Quality Test Plan (QTP) for client projects; Method Statements, Vendor Documentation and Maintenance& Operations Manuals. • Witness and supervision for electrical tests: - Continuity and insulation resistance test for low voltage cables - Insulation resistance test and Solo-run test for motors and verify protection according to motor data. • Witness and supervision test for instrument devices: - Supervision of instrumentation work (cable pulling, instrument installation, hydrostatic test, pressure test) on site. - Loop check test for I/O (Input/output) signals between instruments and DCS (Data Control System). - SAT (Site Acceptance Test) to achieve calibration certificate using P&IDs, instrument lists, Hook-up drawings, loop diagrams. • Development of quality plans that coverall stages of the project, preparing and sending to the client of MCC (Mechanical Completion Certificates) and TOP Dossier (Turn-Over Package) - documentation handover.
QA/QC E&I Engineer Commissioning
Voith Hydro/Germany
jan 2016
-
jul 2016
Project, Type & Design: : Hydro Power Plant Project/Ingula Pumped Storage Scheme-Ladysmith/ South Africa Details of Experience: • Inspection for clearance of Master Punch List. • Coordinate and assist construction team to solve any encountered problems related to inspection and testing activities to meet schedule and avoid any delay of activities. • Technical assistance for Commissioning Manager and Electrical & Instrument Commissioning team leader for planning development and reporting liaise with construction/mechanical completion groups, evolution, modifications during testing and commissioning of electrical, and instrumentation devices. • Correction and harmonization drawings from different revisions, preparation of Red Mark and As Built for drawings (electrical and instrumentation) to achieve the final drawings by engineering department Voith/Heidenheim-Germany.
Senior Electrical Technician Commissioning
Petrofac/UAE
fev 2015
-
dez 2015
Project, Type & Design: Upgrading Oil&Gas Platform- FPF1- Greater Stella Platform ( Floating Production Facility) in Gdansk Shipyard/Poland Details of Experience: • Performed visual inspection& pre-commissioning for: motors, power cables, gas turbine motor, emergency generator, seawater pump, air compressors. • Performed inspection and pre-commissioning before energize the following electrical equipment such as: transformers;, Un-interruptible power supply (UPS), MCC (Motor Control Center), normal and emergency lighting ,small power distribution board for completion ITR's type A to be sure all electrical equipment and systems are operated safely in compliance with safety standard and regulatory documents as per commissioning requirements and procedures • Assist the Electrical& Instrument Manager for planning development and reporting liaise with construction/mechanical completion groups on a daily basis • Witness and supervision for: commissioning and energization (vendor present in site) of low voltage switchgears (Schneider) functional test, testing f CT & VT; contact resistance test and interlock test. • Solo-run test for motors and verify protection according to motor data. • Insulation Resistance Test for motors and LV cables. • Energization of distribution boards for lighting and socket outlet. • For power transformers: Winding Resistance Measurement; Insulation Resistance Test; Ratio and Vector Group Test; Measurement of no-load loss and current (Open circuit test); tests. On-load tap-changer. • High Pot Test for High Voltage cables. • Reviewing commissioning procedures and implementing changes where required. • Final drafting of Mechanical Completion Dossier and Commissioning Dossier, coordinating closure of punch items and ensuring that all information were recorded for final handover to operations.
QA/QC E&I Inspector
Eni-Saipem/Italy
jan 2013
-
dez 2013
Project, Type & Design: Shah Gas Development Package 5 (127 km Gas Pipeline). Details of Experience: • QA/QC-supervision and Quality control during construction/erection phase, responsible and familiarized with the job specifications, review all documentation associated with Electrical Installation, RFI (Request for Inspection);Inspection &Test Plans (ITP), Procedures, Method Statements, Vendor Documentation, Maintenance&Operations Manuals and to survey if the work of Subcontractors donnas per standards and specifications. • Implementing coverage of proper installation, wiring and cable laying, cladding, termination, witnessing of insulation resistance test and Hipot-Test. • Coordinate and assist construction to solve any encountered problems related to inspection and testing activities to meet schedule and avoid any delay of activities. • Prepare internal punch list and coordinate with the construction prior for inspections. • Coordinate with the client for punch list closure and final acceptance. • Checking of single line diagram, engineering specification, material specification. • Inspection of power lighting fixtures, earthing cables, earthing bus bar, junction box, lightning protection system. • Inspection of installation for pole lights, area lights, emergency and normal lights. • Inspection and testing (insulation and continuity) of LV; HV; Data and Fiber Optic cables. • Inspection of CCTV system, Access control system, Optical and sound warning system. • Participate in Walk Down for the completed system.
Electrical Technician
Tozzi Sud Spa/Italy
ago 2012
-
nov 2012
Project, Type & Design: Construction of Gas Platform- West Franklin and Elgin B project in Ravenna/Italy. Details of Experience: • Electrical connections in Technical Equipment Room: - Connecting power cables in HVAC heaters panel. - Connecting instrumentation cables in F&G marshalling cabinets. - Connecting cables in field electrical and instrumentation JB. - Electrical connections for local control stations. - Connecting speakers for PA-GA system. - Connecting ESD push buttons. - Pulling dressing and tagging cables. - Installing Roxtec penetrations in panels and walls penetrations. - Glanding cables (Hawke glands). • Electrical connections for field instruments such as: - Temperature transmitters. - Pressure transmitters. - Actuators. - Electro valves. - Electrical connections for LV electrical engines (including heaters and thermistors).
Electrical Supervisor
Techint/Italy
ago 2010
-
out 2011
Project, Type & Design: GTL Project (Gas to Liquid)/Escravos-Nigeria. Details of Experience: I have worked in Nigeria, client Chevron- U.S.A. and Southern Gas Company Nigeria, contractor Techint_Cimi_Montubi Nigeria Ltd as Electrical Supervisor specialist in the execution of electrical installations. Here I have led 3 teams with 6-10 local workers each with which we have executed: • Team1 worked - for cable trays; electrical circuits for normal lighting and emergency; Installing, connection and checking smoke detectors by stations and substations; erection and installing device for high mast lighting pole. • Team2 worked:performed3M joints for cable terminals; Installing and connection batteries in battery room; installing infrared device for medium and high voltage panels; installing and connection junction box; installing, connection and checking electrical equipment's by station (panels, drawers, switches); different cables glands for the stations and substations. • Team3 worked: Installing power transformers, installing Bus-duct; connection bus bar inside of Bus- duct; grounding; installing and connections for over 25 cathodic protection transformers; realization of grid for cathodes protections around and inside the area; pulling cables.
QA/QC E&I Inspector
IREM/Italy
jan 2009
-
out 2009
Project, Type & Design: ADRIATIC LNG. Details of Experience: QA/QC supervision & Quality control during construction/erection phase, responsible with Electrical Inspection as per ITP (Inspection and Test Plan), Single line diagram, engineering specification, material specification. • Inspections of: earthing system, LV cables, cable ladder/trays, miscellaneous electrical equipment. Switchgears. • Testing of draw-out position even for incoming Bus-tie circuit breakers shall be electrically interlocked. • Inspection of installation of: fiber optic cables, electrical and instrument devices as per P&ID, instrument datasheet, layout drawings (single line diagram) and schematic diagram. • Inspection pf terminations in: JB’s, cables pulling schedule, functional test for pressure safety valves, UPS-System, Fire & Gas devices, Emergency Shutdown System.
Electrical Technician Operating and Maintenance Gas Turbine Turbo Mach
Petrochemical Plant Borzesti/România
jan 2007
-
Atualmente
Project, Type & Design: Production of energy and steam-Petrochemical Plant Borzesti/Romania. Details of Experience: • Operating and Maintenance 9MVATaurusT70 CED-Solonox Caterpillar Solar Turbine USA turbo- generator set of electrical equipment such as: - Taurus T70 gas turbine-Solar Turbines; - Gas compressor(screw type)136kw-Enerproject; - 2 Air compressors (screw type) 7kw-AtlasCopco; - Three-phases synchronous electric generator, LSABMBL13 type, 9000KVA/6300V; - HV step-up transformer TTUS-FS(OFAF)40MVA110/6KV; - MV step-down transformer TTU-ONAN 1000KVA6/0.4KV; - Three-phase oil immersed transformer (France-Schneider) 800KVA, 6/0.4KV; - HV oil circuit breakers with oleo-pneumatically release( 110 KV); - MV switchgears 17, 5 KV (MC Set-Merlin Gerin); - 6KV withdrawable circuit breakers( SF6 type) – Merlin Gerin; - 6KV withdrawable circuit breakers (vacuum type) – ABB; - Maintaining and monitoring the operational efficiency of all electrical equipment to ensure optimum performance and carrying out remedial works. - Recording parameters data.
Electrical Technician High Voltage equipment 6 KV and 110 KV
Petrochemical Plant Borzesti/România
mai 2000
-
jan 2007
Project, Type & Design: Distribution of Energy in Petrochemical Plant Borzesti/Romania. Details of Experience: • Works of operating high voltage electrical equipment- Power Transformer Station 110KV/6KV-SRA1 Petrochemical Plant Borzesti. • Perform maneuvers with electrical 110kv high voltage, power transformers 40MVA and 63MVA, switches 110KV with MOP devices (oleo-pneumatic mechanism), line separators on air 110kv power lines, related rigging equipment with electric medium voltage withdrawable circuits breakers 6KV on departures from sections bar, on electrical transformer station 110KV/6KV- SRA1 Petrochemical Plant Borzesti România.
Electrical Technician for Low Voltage equipment 0.4KV
Petrochemical Plant Borzesti/România
mai 1988
-
mai 2000
Project, Type & Design: Operating and Maintenance for Low Voltage equipment in Petrochemical Plant Borzesti/România. Details of Experience: • Repairs, maintenance and operation of electrical motors of low and high voltage and HVAC equipment. • Maintenance of roads lightning inside and outside the company location. • Due to the fact that the operation of the company takes place in a corrosive environment, also I have replaced the cable trays. • I have performed erection and installation of switchboards for different types of electrical motors. • I have worked in different plants with three – phase sockets and 220V sockets, switches, different types of lightning fixtures, transformers and welding machines. • Being a chemical plant I have worked a lot in explosive medium with anti – ex equipment, ventilation systems, acoustic and optic warning devices for detection of gases within respective area. • Maintenance of low voltage stations and of main switchboards. • I have performed installation of switchboards for motors remote control with thermal relays, contactors, star-delta motor starters.
Electrician
Petrochemical Plant Borzesti/România
abr 1985
-
dez 1986
Project, Type & Design: Maintenance and repairs on high-voltage (110 KV in Petrochemical Plant Borzesti/România. Details of Experience: Maintenance and repairs on high-voltage (110 KV) equipment in: - Refinery- RAFO S.A.BORZESTI- România. - Rubber Plant- CAROM S.A.BORZESTI- România. - Petrochemical Plant- CHIMCOMPLEX S.A. BORZESTI- România.
Formação
Electromechanical Instrumentation
High School-Petru Poni, Onesti (Romania)
set 1986
-
jul 1990
Electrical
Vocational School-Petru Poni, Onesti (Romania)
set 1983
-
fev 1985
Idiomas
English - Advanced
Informações Adicionais
Training or License
3M Certificate-Termination and Splicing High Voltage Cables.
Curriculum relacionados