Electrical engineer
Ham*** ***** (XX anos)
Electrical equipment production supervisor em Telinstra Fz Automation & Electrical Contracting company Dubai, Uae
TSI UNIVERSITY
Lisboa,
Lisboa
|
Experiência
Electrical equipment production supervisor
Telinstra Fz Automation & Electrical Contracting company Dubai, Uae
jan 2017
-
fev 2018
· InstallationofModulatingtypeactuatorandopencloseactuatorand temperature trans meter in chilled water line and loop checking of instruments and commissioning. · Cable pulling and cable tray lying work. · InstallationofFirealarmprotectionsystemandPreventivemaintenance. · commissioning of flow meter , plc panel and Ultra sonic LevelTransmitters . · Btu meter installion of each chiller pair circuit. · Material coordinator. · Complete wiring of distribution panel. · Have goodKnowledge onsitemanagement andconstructionwork. · Good experience of MEP work and BMS work.
Operation & Maintenance Engineer
Matco Rice Processing (pvt) Ltd
jan 2016
-
dez 2016
Substation & Power house designing and development. · Operation & Control of Diesel Engines. · Highvoltageswitching andSynchronization of generator’s. Maintain transmission equipment,performing oncircuit breakers&Transformers
Electrical Engineer
Nishat Textile (Pvt) Ltd
jan 2013
-
nov 2015
◦ Electrical wiring and complete maintenance of building works. ◦ Installation of LVElectricalPanelsCommissioning andTroubleshooting. ◦ Laying of HT& LTcables and installation of transformer ◦ Installation of FireAlarm and smoke detectorfor safety system. ◦ Installation and Design Calculation for Load Schedules, Breaker sizing, Cable sizing, Cable tray. ◦ Troubleshooting and maintenance of Weaving (Tsudakoma Zax Professional)Loom.Sizing&Warpingmachines(Benninger). ◦ Yearly maintenance and over hauling of AC PLANTS. ◦ Troubleshooting and maintenance of Cooper Compressor,L.G Absorption Chillers (85,240 ,500 , 560 Tons). · Centrifugal pumps,multistage pumps,gear pumps&diaphragm pumps maintenance. · ScheduledYearly maintenance of motors up to 15KW. · SS, MS, GI, PPRC, PVC pipe laying. · Ability to manage multiple projects single handedly. · Ability to lead a team of technicians and workers to the completion of projects · Erection of coal based boiler
Formação
MASTER OF ELECTRONICS ENGINEERING
TSI UNIVERSITY
Idiomas
Enlish - B2