Project management
Fáb*** *****
Project Engineer Manager em Cerealto Siro Foods
IMF Business School
Alenquer,
Lisboa
|
Experiência
Project Engineer Manager
Cerealto Siro Foods
out 2018
-
Atualmente
Main Projects/Customers: assembly of a can filling line for baby food from the scratch (up to a max. speed line of 200 cans-per-minute) / Kraft Heinz > Cross-functional team (e.g. operators, maintenance technicians) management and leadership; > Project budget and time plan definition; > Equipment selection, cost negotiation and supplier approval (FAT and SAT); > Process line approval, fine tuning and ramp-up;
Product Development Engineer
TE Connectivity
abr 2014
-
set 2018
Main Projects/Customers: development of an HCR (High Current Relay) for battery start-stop application with plasma treatment as pre-glueing process / FCA; - Development of an HCR (up to 150A) for cooling fan switch with an IPX9K housing system with seal rings mounted on load terminals / BMW. >Product development (Concept, Design, Validation, Industrialization up toProduction); > Product life-cycle (risk assessment/FMEA, VAVE – Value Analysis/Value Engineering, Quality complaints, Product specification, problem-solving, etc.); > Cross-functional team (e.g. Manufacturing, Quality and Production) management for new projects.
Mechanical Design Engineer
Siemens
mai 2011
-
mar 2014
Main Projects/Customers: mobile substation and power transformers up to 250 MVA and 245 kV BIL 1050 kV / EDP, REN, Exxon Mobil, Technip, etc. > Mechanical design of active part of power transformers (BOM, dimensioning, 2D/3D CAD modeling and parameterization of windings, winding assembly and electric connections/busbar up to bushings); > Participation at shop floor level conducting Kaizen events and other Lean management tools (e.g. 5S+1, 7 wastes, 6 Sigma, etc.) for quality process fabrication and control (Quality Gates).
Technical/Commercial Engineer
Martifer
mai 2010
-
abr 2011
Main Projects/Customers: wind farm in Eastern Cape with 135 MW of power capacity (project lost in final stages of tendering process)/ Cookhouse > Commercial turn-key proposals for EPC contracts of wind energy projects; > Wind site assessment (WTG - Wind Turbine Generator layout and power flow losses analysis); > SLD – Single Line Diagram, dimensioning of MV cables and electric power losses analysis.
Formação
MBA
IMF Business School
2018
-
2020
Msc. Electromechanical Engineering
UBI
2005
-
2010
Six Sigma and Lean: Quantitative tools for Quality and Productivity Professional
Technische Universität München
Project Management
TE Connectivity
Idiomas
English - Fluent
Spanish - Intermediate
Portuguese - Native
Informações Adicionais
www.linkedin.com/in/fábio-silva-4926732b
Curriculum relacionados